20MVA 30kv Earthing Oil Immersed Power Transformer
Key attributes
Usage:Power
Phase:Three
Coil Structure:TOROIDAL
Coil Number:Three-phase Two-winding
Place of Origin:Zhejiang, China
Model Number:SFZ11-20000/30-10
Type:Two winding
Service Condition:Indoor/Outdoor
Tap Changer:Nltc/Oltc
Cooling Type:Ofwf/Onan
Core Structure:Toroidal
High Voltage Range:30-110kv
Iron Core:Silicon Sheet
Frequency:50Hz/60Hz
Bushing:Porcelain
Winding Material:Copper
Product Description
30KV power transformer is popular world wide in different industry. It is impact and cost-effient.
Capacity |
6300-180000KVA,Photo on the left shows a 2000kva transformer. |
Primary voltage |
30kv 69kv 110kv 121kv 138kv |
Secondary voltage |
6.3kv, 6.6kv, 10.5kv, 11kv,
13.8kv ,15.75kv, 18kv ,20kv 35kv,37kv,38.5kv |
Tap range |
±8*1.25%,±2*2.5%at primary side |
Impdedance |
10-15% |
Frequency |
50/60 Hz |
Transformer and reactor in lab
Reactor under test
Testing are conducted for every transformer before delivery.Tests are classified to be routine tests and type test.
A - Routine tests: According to IEC 60076 standard , the following tests must be carried out for all units of the transformers
a- Measurement of winding resistance .
b- Measurement of voltage ratio and check of phase displacement.
c- Measurement of short circuit impedance and load losses.
d-Measurement of no-load losses and current .
e-Dielectric routine tests including the separate source AC voltage withstanding test and short duration induced over voltage withstanding test ( ACSD ) .
B - Type tests : The following tests shall be carried out
a- Temperature rise test
b- Lightning impulse test
C - Special tests :
a- Determination of noise level according to IEC 60551 .
b- Oil leakage test
c- Overload test at 150 % rated current for one hour after temperature rise test ( top oil temperature rise and winding temperature rise must be measured and recorded in the report test also hot spot temperature rise must be calculated and recorded on the report test ) .
d- Short Circuit Dynamic stability Test (test report from independent and accredited laboratory for similar transformer will be accepted).
Test Procedure sample
1.Leak testing with pressure for liquid-immersed transformers Oil test
1) Color/Appearance
2) Oil dielectric loss tanδ
3) Break down voltage of oil
4) Dissolved gas analysis in oil
2.Measurement of voltage ratio and check of phase displacement
3.Measurement of winding resistance
4.Measurement of dissipation factor (tanδ) of the insulation system capacitances, and determination of capacitances
5.windings-to-earth and between windings.
6.Measurement of d. c. insulation resistance between each winding to earth and between windings
7.Measurement of no-load loss and current at 90%, 100%, 110% of rated voltage
8.Measurement of short-circuit impedance and load loss
9.Applied voltage test
10.Induced voltage test
11.Frequency response analysis-FRA test
12.Temperature-rise test
13.Sound level/noise test
14.Lighting impulse test
15.Operation impulse test
Packing&Shipping
Wooden cases/crates iron structure
Accessories are packed in a welded steel structure before packing on wood plates.
Polywood crates.
Polywood crates are applied for packing to accessories and small distribution transformers.
Loading transformer to truck
SHENDA has 75 tons and 50 tons crane for lifting transformers.
Steel structures protection
Small distribution transformers are packed in a welded steel structure before packing on wood plates.
Nude transformer mainbody
All drivers and truck have certificate to drive in China.Lashing chains are fixed at trucks robustly.Nitrogen or oil is filled for main body.
Transport to port.
All trucks are approved and certified to carry heavy cargos in china, transport from Jiangshan to shanghai or ningbo takes 6 hours.
Transformer oil tank
Oil tank filled with oil for filling after arrival on site.This tank is made by shenda and can be reused on site.
Terminal box and tap changer control box wood protection
Wood box are applied to protection HV or LV terminal box and tap changer control box or any other parts easy to get collision.
Transformer unloading at Shanghai port.
Transformer loading at Shanghai port